Paint The World

Its been awhile since the last update.. so there is a lot to catch up on. Since the last update there has been some painting, some assembling, lots of drywall, a little flooring and some more painting. (Be prepared it may be a little wordy, but Ill add lots of pictures for those of you like me)

The drywall in the house is now complete. We went with a smooth finish as opposed to texture to keep with our sleek modern look. And of course, like most of our decisions, we chose the one that is the most difficult. Since every ding will show, we had to be extra careful not to hit the wall and always keep some mud handy.

The next step was to paint, we chose a light grey for the main walls, and a dark grey for the beams (which we recently re-painted since the first color choice was no bueno.) We are happy with our choices… for nowPaint choices have by far been the hardest decisions for me, and after re-painting our front door and the interior beams, I  feel a little like I am fullfilling Sherwin Williams motto: Paint the World. Oh by the way, we have to re-paint both our front door and storage room door. (FYI: don’t just use the sample paint you get from Sherwin Williams, it wont hold up.. Yay for round 3 of painting our door!)

Here is the final drywall before we sprayed the primer. Notice the darker beams, as opposed to the not so eye-pleasing greenish beams below. We are much happier with the darker beam choice. (Also, check out the exposed duct work)

Untitled

The beam color before we came to our decorating senses.

Untitled

We decided to spray the walls to save some time, but since we did go with a smooth finish we had to back roll during the process to prevent a rough texture from emerging. Here is Kent and Tyler doing just that:

Bright container house

Lots of painting has been going on, so Tyler and I’s “date nights”  now are spent working on the house. Here is us after our date night theme “Dinner and a little role play” (Alien vs. Predator style)

Untitled

We also accomplished some of the prep work for our flooring in our bottom two containers. In the entryway, laundry and utility room container we poured a self leveling concrete floor and in our master bedroom/closet we layed 3/4th inch recycled plywood. In the master bath we installed in-floor electric heating and then poured self leveling concrete to prepare for the tile. Our bathroom also has a few more updates, including: durarock installation in the shower surround, and the plumbing for our shower head and sprayers. Our tub was also put in place upstairs.

Before (entryway/laundry/utility room)

Untitled

Here is Tyler pouring the self-leveling concrete.

Bright container house

While Kent and I (mainly Kent) mixed it up. (sorry about the picture, it was dark outside.)

Bright container house

The finish product, it is now ready for cork.

Bright container house

This is the master bedroom and closet floor before the plywood.

Bright container house

Tyler cutting the plywood

Bright container house

Here is the dirty plywood floor (Since it was re-used), Tyler’s mom recently cleaned it for us, so it is almost ready for cork.

Untitled

Here is the shower plumbling: There are two body sprayers, a shower head, and a rain shower in our master shower.

Untitled

The durarock in the shower

Untitled
In-floor heating being installed

Bright container house

Bright container house

Bright container house

Bathtub upstairs

Untitled
hmm.. lets see.. what else has been done..

Oh! Exciting news… I assembled our Ikea patio furniture over the weekend, and it looks great. Now we have a spot to eat when we are working on the house, instead of using un-ordinary things for our chair and tables, like a paint bucket and a step ladder.

Bright container house

Can’t wait till we live here so we can enjoy this deck.

Bright container house

The deck is still not complete, we have purchased our railing and should be starting on that soon.

Now some decorating decisions! Check out our bathroom tile..

The pebble tile will be the floor tile in our shower, and the larger light grey tile will be our wall tile in our shower and around the stall area. The glass tile is our accent tile, and the dark grey is our main floor tile.

Bright container house

Im sure there are other updates I am forgetting about, but the next time I have time to post again I’ll add them in. As for the next post.. it should hopefully include: bathroom tile, kitchen install, and lighting.

Sneak Peak:

Bright container house

Advertisements

IKEA Overload

Untitled

Our lastest venture was our most recent trip to Ikea. It definitely wasn’t the relaxing, grab a few things type of weekend that I thought it would be. I knew that we needed a Uhaul, but what I didn’t realize was that we would need a 26-ft long one. I originally thought that it was a little overkill, but after 12 hours inside of an IKEA, it’s pretty easy to fill one up.

Untitled

Before arriving in Frisco, TX, Tyler and I had made all the preparations for the trip:

-money – check (after many hours of back and forth with the bank)

-driving arrangements – check

kitchen design – check

-hotel booked – thought so, but no, no check

-list of items to buy – check for the first night, but not the second

Our plan was to arrive in Frisco Saturday afternoon, with a couple of stops in OKC to pick up Sheilah, Tyler’s mom,  and to shop at a nearby retro shop. Then, we planned to  leisurely make it into Dallas to shop at a few more vintage shops, and then finalize a few decisions at Ikea before heading to bed at a reasonanble hour. The only thing that actually happened, was picking Sheilah up and shopping at one vintage shop in OKC. Well long story short, the reason our plans were altered was because, between Saturday and Sunday, we were inside of Ikea for a total of 12 hours. Needless to say, we never made it into Dallas, and that most of our preparations did not work out.

Even though the weekend was a little stressful we did accomplish a lot. We bought our entire kitchen, appliances and all, our master bedroom closet stuff, a couch, our patio furniture, some storage items, some accesories and more..

Here are some pictures of the trip

Breakfast before the rude awakening of how many boxes we were going to have to load that day..

Untitled

Everything you see here, was our first load.. Our Kitchen..

Untitled

The kitchen minus the appliances loaded up.

Untitled

Round two: This is only some of the second load, a couple carts had already been loaded.

Untitled

Everything loaded. We were definitely thankful Kent and Sheilah came along..

Untitled

So now that everything is unloaded at the house, 12 hours of Ikea, equals a whole lot of hours of installation…

And other news:

 -The sheetrock is almost complete, after many hours of Tyler, my dad, my uncle Chile, Matt, Kent and others hanging it. We have hired someone to do the finishing touches on it and they should be done this week.

-Our cork floor arrived from Canada today for our bottom two containers

Progress Update!

This post may seem like a repeat, and it should since the bottom story steps are practically the same. So feel free to skip the explanations and just check out the pictures if you have been following along. (Don’t forget to click on the flickr link to the right to see  all of our pictures!)

Progress:

-Metal studs were used to frame out the upstairs, we chose metal studs since they are made from recycled materials, recyclable, and weather, fire and termite proof.

-The outdoor electrical receptacles were roughed in

-Open cell spray foam, with a R-40 insulation value was applied to the top story

-Wafer board and house wrap were also installed

-The flue for the fireplace was ran on the outside of the house inside of a chase wall

-Stained cement board lap siding is currently be installed, we chose this material for its durability and design qualities

Here is a picture of some of the metal studs and the electrical:

Untitled

Spray foam application:

Untitled

Untitled

Untitled

Wafer board and house wrap:

Untitled

Cement board siding:

Untitled

Untitled

Untitled

The chase and flue:Untitled

Other progress updates include:

Our door windows were installed, now its just waiting for paint, which I’m thinking a nice retro green color.

Untitled

Matt and Tyler tested the flue’s ability to draw smoke out with success! 

Untitled

After a few more full days of siding, the inside progress should finally begin! Now I may get a chance to actually help out…